
CEC is located on 19 rai based in Chonburi. Construction Asset Center "CAC"
is a facility for construction assets of the company. The center is responsible
for streamlining and maximizing utility of majors construction assets , ensuring
optimal use to support operation productivity and efficiency.
The major construction assets which manage by CAC are Sheet piles , Scaffolding
, Containers, Heavy Duty Form Work and Temporary Support Structure. Furthermore,
the CAC engages in investment activities which comply to company's future
construction needs and requirements.
STECON
maintains a fleet of modern equipment including six-wheeled- and ten-wheeled-trucks,
vehicles, as well as heavy duty construction equipment such as various types of
cranes, fork-lifts, rubber and steel rollers, graders and tower and overhead
cranes. Also maintained in our fleets are sheet pile hammers, welding machines,
hydraulic breakers, air compressors, and generators. Our strong and dedicated
team, coupled with the large and modern fleet of construction equipment to
facilitate our construction development, is what makes mega-project delivery a
routine process at STECON.
Our
CEC is located on 19 rai's based in Chonburi. STECON's CEC is charged with over
460 units of machinery and equipment and its 325-strong workforce can
efficiently undertake any of the company's mega-construction projects at any
given time. An annual evaluation takes place to ensure the CEC's efficiency is
higher than the average market index.
Rayong Fabrication Plant II (Nern Kra-Porg at Ban Chang)
Located on 92 rai's (147,200 sqm) occupied by 7 plants
Rayong Fabrication Plant II (Nong Fab at Huay Pong)
Located on 50 rai's (76,800 sqm).
Type of work invoved in the Fabrication Plant
1. Shop Drawing
Design drawing of
fabrication work for factory fabrication according to the clients'
requirements.
2. Metal work transformation and fabrication
Fabricate according to
Shop drawing by utilizing expert craftsmen and state-of-the-art
machinery to fabricate work within
acceptable tolerance limits.
3. Quality inspection
To ensure work delivery
meets stringent control during the fabrication process according
to client specifications and quality standard ISO 9001
version 2000.
4. Surface coating
To enhance durability
due to wear and tear of extreme weather conditions while
improving
quality of the work site. Work have to redefine and confirm
with the clients in
accordance
with the specification and condition .
STECON set up Segment Box Girder plant in order to
facilitate the Airport Rail Link project with the aim of utilizing the facility
as a base for future Transport Mega Project developments. The facility is
located on route 311 at Ban Bung, Chonburi on 100 rai's. This plant input with
high level of engineering content to ensure the productivity and quality of
product .
Our warehouse facility is used for storing
construction material and equipment. This has ensured smooth work-flow and has
proven beneficial for our business in several areas: reduced supply costs,
assured material availability, and centralized material stock has produced
economies of scale necessary for optimal efficiency. Which included the repair
and maintenance tools and equipment .
The first
warehouse facility is situated in Chonburi, occupying 19 rai's . A second
facility at Map-ta-put estate (9 rai's).